|  | Rail Road Ties - Vertical Design
 
 1985: Vertical Tie Design 
Commack, New York
 ITEM- RRT - 11
 
 
Stage 1 - Property Plan and site survey. Plan was to conceal the pool pump and filter.Stage 2 - Site preparation to include removal of old; bush, shrubs and roots  with our Bobcat.  Complete Demolition of all old wall structures. Latter all  debris was hauled to land fill and discarded.Stage 3 - Bobcat used to backfill behind all walls after construction was completed. This was a brand new vertical wall construction and plan. Latter plants and white stone was added to design.  All timbers used were; 30 year cca, grade 1, pressure treated lumber. |  |